example, house, etc Reject
Reports Update
Add New Facility
Use this to find facility ventilation levels for each room. If unable to find the facility use this view to enter the data. When done manually transfer all the data to the CAB form.
A PAD computer is suggested but this can be done on a smartphone.
Search Results (select link to load survey or start adding data for a new survey.)
No Results. Check CAB for Data then Add ACH Site Survey Data in the table below.
Check and Update the CAB with this data: Go to CAB data s . f
Facility Name-Location (e.g. W&J Bar-Poplar St)
Comments (e.g facility type like house, restaurant, clubhouse, airport; date, location; hvac, fan conditions; etc.)
Save (will save survey data if there is Facility Name and Location.)
ACH Entry end
Power Entries: Calculate Power Manually Enter Power Total Mechanical Watts
Unoccupied Power Percent (1-100): %
Factors
Occupancy (hrs/annual days): (e.g. 24/365) Occupancy Duty Cycle (1-100): %
Mech Watts / CFM:
UV Other Watts / Cu-Ft: UV-C Far UV Other
UV Other Watts / Sq-Ft: UV-C Far UV Other
UV Watts: Use CuFt Use SqFt
CO2 lbs. per kWh:
Metrics
Rooms: 1 Square Feet: 0 Cubic Feet: 0 CFM: 0 Occupancy (hrs/days): 16/365
ACH (avg): 0 ACH (max): 0 ACH (min not zero): 1000
Climate Change Annual Carbon Load
Watts Mechanical: 0 Watts UV-C: 0 Watts UV-Far: 0 Watts Other: 0 Watts Total: 0
Occupancy: 16 Hrs . 365 Days . 5840 Total Hours Occupancy Duty Cycle (1-100): 95% Occupied Hours: 5548
Occupied Kilo Watt Hours (kWh): 0 Unoccupied Kilo Watt Hours (kWh): 0 Total Kilo Watt Hours (kWh): 0
Total Watts per sqft: Total Watts per cuft: Total Watts per 1000 sqft:
CAB v 0.11 R -1
12:50:44 Start Time12:50:44 End Time0 Seconds
5.026003 cab pid: 2672958 httpd pid: error pid: