About Us Contact Us

Building Data Report

0. Space TypeBOS-School
1. Establishment NameGreater Egleston High School
2. Addressaddress
3. CityBoston
4. State / ProvinceMA
5. CountryUSA
6. Date03/21/2021
7. Data SourceSchool District
8. Performed byExternal Company
9. Company Name Address ContactCashins & Associates, Inc. 599 North Ave #8, Wakefield, MA 01880
10. Requirement SourceBoston School 3 ACH guideline
11. TechnologyCentral HVAC
12. Min ACH0
13. Max ACH10.8
14. Avg ACH7.6
15. eACH0
16. Filter MERV---
17. Percent Outside Air100
18. ON and Ventilates Entire Indoor AreaYes
19. Vent Clearance min 6 ftYes
20. No of Rooms6
21. sqft900
22. cuft9000
23. No of Buildings1
24. Comments Source Boston School District March 18, 2021. https://www.bostonpublicschools.org/Page/8463 . https://drive.google.com/file/d/1bzam7XeMQDjjv7Og_86PS41K78hBEOfT/view . assumed 10ft ceiling. wACH windows provided in dataset. Calculated wACH from measured CFM rates in dataset do not match. Differences due to errors. Did not use calculated wACH.

Room 205. Diffuser air volume (cfm) 1262. % Outside air 100. Calculated air volume (cfm) outside 1262. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 1262. ACH outside 10.8. ACH total 10.8. ACH Copy paste check (uses total or outside) 10.8.

Room 210. Diffuser air volume (cfm) Not Operating. % Outside air 100. Calculated air volume (cfm) outside 0. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 0. ACH outside 0. ACH total 0. ACH Copy paste check (uses total or outside) 0.

Room 211. Diffuser air volume (cfm) 604. % Outside air 100. Calculated air volume (cfm) outside 604. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 604. ACH outside 7.6. ACH total 7.6. ACH Copy paste check (uses total or outside) 7.6.

Room 215. Diffuser air volume (cfm) 857. % Outside air 100. Calculated air volume (cfm) outside 857. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 857. ACH outside 9.9. ACH total 9.9. ACH Copy paste check (uses total or outside) 9.9.

Room 216. Diffuser air volume (cfm) 902. % Outside air 100. Calculated air volume (cfm) outside 902. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 902. ACH outside 6.7. ACH total 6.7. ACH Copy paste check (uses total or outside) 6.7.

Room 101. Diffuser air volume (cfm) 375. % Outside air 100. Calculated air volume (cfm) outside 375. Calculated air volume (cfm) return 0. Filter efficiency (decimal) 0. Combined air volume (cfm) 375. ACH outside 2.5. ACH total 2.5.


Facility Panel

Note: There is no Existing Survey or Realtime Data file: surveys/Greater Egleston High School.txt. Feel free to add Survey data. Greater Egleston High School

CAB v 0.11 R -1

14:24:39 Start Time
14:24:39 End Time
0 Seconds

5.026003 cab pid: 4144014 httpd pid: error pid: